By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Magadh TodayMagadh TodayMagadh Today
  • Home
  • India
  • Editorial
  • Opinion
  • Global
  • Technology
  • Science
  • Asia
  • Business
  • Finance
Reading: New Patna Airport Terminal Bldg By May 2024
Share
Notification Show More
Aa
Magadh TodayMagadh Today
Aa
  • India
  • Economy
  • Politics
  • Business
  • Technology
  • Finance
  • Editorial
  • Opinion
  • Science
  • Home
  • Technology
  • Business
  • Economy
  • Politics
  • Science
  • Sitemap
Have an existing account? Sign In
Follow US
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Magadh Today > Latest News > Bihar > New Patna Airport Terminal Bldg By May 2024
BiharIndia

New Patna Airport Terminal Bldg By May 2024

Gulshan Kumar
Last updated: 2023/12/17 at 11:35 AM
By Gulshan Kumar 2 years ago
Share
SHARE

PATNA:The eagerly awaited new terminal building at Jayaprakash Narayan International Airport in Patna is on track to be completed by mid-2024, according to airport sources. Initiated in October 2018 with an estimated expenditure of Rs 1,216 crore, the project faced setbacks due to the Covid pandemic, delays in land acquisition, and other unavoidable factors, causing it to miss the initial deadline of 2022.

K.S. Vijayan, General Manager (Engineering), Projects, AAI-Patna,* stated that approximately 71% of the civil work has been accomplished. The 65,155sqm world-class terminal, drawing inspiration from the square forms of Nalanda University ruins, is designed to handle 3,000 passengers during peak hours.

The ground floor, dedicated to arrivals, features a central green area adorned with Madhubani paintings. The first floor, connected by a flyover, houses the departure area. The four-star GRIHA-rated energy-efficient building incorporates sustainability features.

Equipped with state-of-the-art facilities, the terminal boasts five passenger boarding bridges, five conveyor belts, 54 check-in counters, and eight inline XBIS machines for baggage inspection. Speedy check-ins are facilitated by the presence of 54 check-in counters.

Vijayan mentioned that the new terminal will accommodate 10 million passengers annually, a substantial increase from the current building’s capacity of 2.5 million. Following the new terminal’s commissioning, the existing structure will make way for aerobridges and aprons, allowing parking for 11 flights simultaneously.

Simultaneously, upgrades to airside facilities are underway, with completed re-carpeting of the runway and construction of the isolation bay. The remaining work includes the link road connecting the isolation bay, expected to be completed before March next year.

 

You Might Also Like

Congress MP Manish Tewari brings bill in Lok Sabha seeking to let MPs take their own voting line

Bihar government allocates 10.11 acres of land in Patna to TTD to build Sri Venkateswara temple

Bihar Discoms seek tariff hike and rural-urban rate convergence

Bihar to create three new government departments in push to deliver 1 crore jobs by 2030

Supreme Court of India: Temple funds belong to the Deity, cannot be used to prop up ailing Cooperative Banks

Share This Article
Facebook Twitter Whatsapp Whatsapp LinkedIn Reddit Telegram Copy Link Print
Previous Article Phone parts of all Parliament security breach accused found from Rajasthan: Report
Next Article Shami ruled out, Deepak Chahar withdrawn; BCCI makes multiple changes to India’s ODI and Test squads vs South Africa
about us

Your daily dose of news and updates on politics, culture, and events around the globe. Stay informed, stay connected!

Quick Links

  • Home
  • Sitemap
  • Contact
  • About
  • Privacy Policy
  • Terms and Conditions
Magadh TodayMagadh Today
© Magadh Today Network. All Rights Reserved.
Go to mobile version
adbanner
AdBlock Detected
Our site is an advertising supported site. Please whitelist to support our site.
Okay, I'll Whitelist
Welcome Back!

Sign in to your account

Lost your password?